Hot work
How this hazard manifests:
Hot work created by welding, cutting etc to be considered during the construction phase but planned in at this stage in the design risk assessment
Typical control measures
Minimisation of hot work carried out under permit to work systems. Consideration of additional controls such as isolations if hot work is undertaken during commissioning, operations and maintenance stages of the lifecycle. Fire watchers and post activity monitoring. Checking of extinguishers prior to hot work.